August 5, 2006
Basement: part two
Slight detour on the basement refurbishing this evening. I decided to patch up some dents in the walls and fix the edging on the ceiling as you go down the stairs — it was quite deteriorated and an eye-sore. So I’ve gotta wait for the drywall compound to dry before I can sand it down and wipe down the walls.
I also picked up a different style of vinyl tiling, something that would go better with the colors I’ve chosen. One thing’s for sure, it’s going to look really cool down there.
I hope to have pictures tonight.

August 5, 2006, 5:29 pm
Filed under: Home Ownership
Leave a Comment
You must be logged in to post a comment.

